The pavement condition rating (PCR) of the existing surface is 50. The existing cracking left untreated will result in base failure.
Projects — TIB Project Information
TIB Project Information
City of Bridgeport's FY 2013 Overlay Project
2-E-851(003)-1
2-E-851(003)-1
FY 2013 Overlay Project
Multiple Locations
FY 2013 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $101,365
County: Douglas | Legislative District: 12 | Project Length: 0.36 | TIB Engineer: Andrew Beagle | Last Payment Date: 07/15/2014
Project Information
Lead Agency | BRIDGEPORT |
Funding Year | 2013 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 12 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.36 mi. |
ADT | 150 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Stuart Dezellem |
Contact Email | pwsuper@nwi.net |
TIB Engineer | Andrew Beagle |
Last Payment Date | 07/15/2014 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/18/2011 | |
Delayed Project Date | 07/01/2014 | |
Predesign Approval | ||
Design Approval | 01/01/2012 | 01/17/2012 |
Bid Auth. Approval | 05/01/2012 | 01/17/2012 |
Construction Approval | 03/01/2014 | 02/24/2014 |
Project Closeout | 12/31/2014 | 07/08/2014 |
Audit Date | 07/15/2014 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 4,490 | 4,995 |
Right of Way | 0 | 0 |
Total Design | 4,490 | 4,995 |
Construction Engineering | 4,490 | 9,397 |
Construction Contract | 80,820 | 86,973 |
Other Construction | 0 | 0 |
Total Construction | 85,310 | 96,370 |
Funding Increase | 17,836 | |
Funding Surplus | - 6,271 | |
Total TIB Funding | 101,365 | 101,365 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
BRIDGEPORT | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The project repairs alligatored areas and places a 2-in overlay on Tacoma Street between 19th and the school complex at 14th.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |