City of Bridgeport's FY 2013 Overlay Project

2-E-851(003)-1

2-E-851(003)-1
FY 2013 Overlay Project

Multiple Locations

FY 2013 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $101,365

County: Douglas   |   Legislative District: 12   |   Project Length: 0.36   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 07/15/2014

Project Information

Lead Agency BRIDGEPORT
Funding Year 2013
Program SCPP
Current Phase Audit
Legislative District 12
Congressional District 4
Federal Route Number 9999
Project Length 0.36 mi.
ADT 150
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Stuart Dezellem
Contact Email pwsuper@nwi.net
TIB Engineer Andrew Beagle
Last Payment Date 07/15/2014

Project Schedule

  Target Date Actual Date
Project Selection Date   11/18/2011
Delayed Project Date 07/01/2014  
Predesign Approval
Design Approval 01/01/2012 01/17/2012
Bid Auth. Approval 05/01/2012 01/17/2012
Construction Approval 03/01/2014 02/24/2014
Project Closeout 12/31/2014 07/08/2014
Audit Date   07/15/2014
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 4,490 4,995
Right of Way 0 0
Total Design 4,490 4,995
     
Construction Engineering 4,490 9,397
Construction Contract 80,820 86,973
Other Construction 0 0
Total Construction 85,310 96,370
     
Funding Increase 17,836  
Funding Surplus - 6,271  
Total TIB Funding 101,365 101,365

Local Funding Partners

Funding Amount Percent
BRIDGEPORT 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

The project repairs alligatored areas and places a 2-in overlay on Tacoma Street between 19th and the school complex at 14th.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.