Projects — TIB Funding Cycles
FY 2023 SCSP Selections
|
|
||||
Region: East | Legislative District: 15 | Length: 825.00 ft. | FY 2023 Small City Sidewalk Program (SCSP) |
![]() |
Existing ConditionsDue to previous years of bad weather, the city has seen a freeze thaw process that has caused many issues with the sidewalks especially around the downtown core area. Due to the lifting and separation of the sidewalk, it has created many tripping/fall hazards that have been compounded during winter weather. There are many areas that have crumbling and spalling concrete that needs to be addressed as well. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 28,656 | 3,184 | 31,840 |
Right of Way | 0 | 0 | 0 |
Construction | 219,681 | 24,409 | 244,090 |
Project Totals | $248,337 | $27,593 | $275,930 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 5% |
Summary of Improvements
- Improves pedestrian safety;
- Removes ADA barriers
Description of Improvements
This project will repair and replace segment of sidewalk.