Projects — TIB Funding Cycles
FY 2021 SCSP Selections
|
|
||||
Region: East | Legislative District: 7 | Length: 900.00 ft. | FY 2021 Small City Sidewalk Program (SCSP) |
![]() |
Existing ConditionsThe East Omak Community Center is located on Benton Street and is a short walk from the pedestrian pathway along US 97. Street, sidewalk, and illumination improvements were recently completed from the Community Center to the intersection of Benton Street and 5th Avenue. There is currently a gap in the pedestrian facilities system between US 97 and the recent improvements leading to the Community Center on Benton Street. This proposal would establish sidewalk on 5th Avenue from Benton Street to US 97 and connect the proposed sidewalk near the community center to the existing pedestrian path which leads to the East Omak Elementary School, the municipal pool, Eastside Park, and the Omak Stampede Visitor Center. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 27,075 | 1,425 | 28,500 |
Right of Way | 0 | 0 | 0 |
Construction | 217,075 | 11,425 | 228,500 |
Project Totals | $244,150 | $12,850 | $257,000 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Summary of Improvements
- Improves pedestrian safety;
- Completes gap;
- Removes ADA barriers
Description of Improvements
A new 5-foot wide sidewalk, curb, and gutter, will be installed to complete the gap between the existing pedestrian path and the community center. Storm drainage facilities or swales will be added to collect and infiltrate stormwater.