Region: East | Legislative District: 6 | Length: 0.00 mi. | FY 2026 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
Anticipated Project Costs
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 5,272 | 278 | 5,550 |
Right of Way | 0 | 0 | 0 |
Construction | 1,289,407 | 68,004 | 1,357,411 |
Project Totals | $1,294,678 | $68,283 | $1,362,961 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |