Projects — TIB Funding Cycles
FY 2025 SCMP Selections
|
|
||||
Region: East | Legislative District: 7 | Length: 0.00 mi. | FY 2025 Small City Maintenance Program (SCMP) |
![]() |
Existing ConditionsMultiple roads within the City of Colville street inventory require crack sealing along the travelled way. Maintenance needs to be completed prior to chip sealing or scrub sealing of roadways. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 77,273 | 4,067 | 81,340 |
Project Totals | $77,273 | $4,067 | $81,340 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Summary of Improvements
Description of Improvements
Perform crack sealing along the travel lanes of entire segments of select roadways within the city.