Region: East | Legislative District: 9 | Length: 0.00 mi. | FY 2025 Small City Maintenance Program (SCMP) |
![]() |
Existing ConditionsMutiple Segments on different roads in the city of Asotin have begun to form extensive cracks in the road surface. These Cracks are large and treatable through crack sealing to preserve the roads before further maintenance will be required. The City of Asotin is concerned that some of these roads will be put into a state of disrepair if maintenance does not occur |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 56,525 | 2,975 | 59,500 |
Project Totals | $56,525 | $2,975 | $59,500 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Summary of Improvements
- Intent for County to do the work.
Description of Improvements
The best treatment at this time is to clean out the existing cracks, and seal them to prolong the useful life of these road segments.