FY 2021 SCAP Selections
|
|
||||
Region: East | Legislative District: 14 | Length: 0.03 mi. | FY 2021 Small City Arterial Program (SCAP) |
![]() |
Existing ConditionsGarfield serves as an access route to the Whitson Elementary School, Rheingarten Park (including businesses within the Park Center Building that is located within Rheingarten Park), and the core downtown commercial area. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 30,331 | 3,370 | 33,701 |
Right of Way | 0 | 0 | 0 |
Construction | 232,542 | 25,838 | 258,380 |
Project Totals | $262,873 | $29,208 | $292,081 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 5% |
Summary of Improvements
- Improves pedestrian safety;
- Improves arterial network;
- Extends improvements;
- Removes ADA barriers
Description of Improvements
The roadway will be excavated and a roadbase will be installed between W. Jewett Blvd. and NW Washington St. Most of the road failure is due to lack of road base. A sidewalk will be installed along the east side connecting it to the sidewalk on Lincoln Street and W. Jewett Blvd. The Lincoln Street Project was completed 2 years ago.