Region: East | Legislative District: 13 | Length: 0.12 mi. | FY 2021 Small City Arterial Program (SCAP) |
![]() |
Existing ConditionsThis section of roadway is located on one of three streets in town that cross the railroad. The roadway is in poor condition with a pavement condition rating of 46. The roadway has alligator cracking and drainage issues. This roadway is one of the direct paths to and from the golf course. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 39,400 | 0 | 39,400 |
Right of Way | 0 | 0 | 0 |
Construction | 253,900 | 0 | 253,900 |
Project Totals | $293,300 | $0 | $293,300 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Summary of Improvements
- The improved roadway will provide for needed drainage improvements, which will help to preserve the roadway and will define parking areas. It will also provide for safer travel for residents and people who travel to use the golf course.
Description of Improvements
The proposed solution is to do a full depth reclamation of the roadway. This will involve paving the travelways with 2 inches of asphalt and add rolled curb on each side of the travelways to properly direct drainage. Gravel parking is also proposed on each side of the roadway, which will be 4 inches thick.