FY 2024 ATP Selections
|
|
||||
Region: East | Legislative District: 9 | Length: 450.00 ft. | FY 2024 Urban Active Transportation Program (ATP) |
![]() |
Existing ConditionsCurrently, there is not a pedestrian connection between the City Park and downtown area. Pedestrians currently walk in the street to get from one facility to another. This sidewalk would also be a main connection between downtown and the school. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 55,700 | 0 | 55,700 |
Right of Way | 0 | 0 | 0 |
Construction | 358,500 | 0 | 358,500 |
Project Totals | $414,200 | $0 | $414,200 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Summary of Improvements
Description of Improvements
Install a sidewalk along the south side of Main Avenue.