Region: East | Legislative District: 13 | Length: 1,400.00 ft. | FY 2024 Urban Active Transportation Program (ATP) |
![]() |
Existing ConditionsThe City of Warden has recently made significant improvements to the pedestrian facilities along Industrial Way and County Road and completed improvements this fall on a pathway/sidewalk on the eastern portion of 1st Street. However, a gap in safe, ADA-compliant facilities exists on W. 1st Street (SR 170) between Industrial Way and County Road. This section of road was identified in the Citys Heritage Trail Feasibility Study as a critical component of the Citys pedestrian network. This segment of W. 1st Street is used by many employees that live in Warden and walk to work in the industrial/commercial area of the City. Without safe facilities, pedestrians are forced to walk along the narrow unimproved shoulders without separation from the roadway which is a busy truck route. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 7,425 | 47,575 | 55,000 |
Right of Way | 0 | 0 | 0 |
Construction | 49,950 | 320,050 | 370,000 |
Project Totals | $57,375 | $367,625 | $425,000 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
13.5% | 86.5% | 5% |
Summary of Improvements
- Improves pedestrian safety;
- Extends improvements;
- Improves vehicle and pedestrian access
Description of Improvements
The proposed project will construct an ADA-compliant pathway along W 1st Street (SR 170) from County Road to the Columbia Basin Railroad crossing, located between Weir Way and Jackson Ave.