Region: East | Legislative District: 8 | Length: 1,380.00 ft. | FY 2024 Urban Active Transportation Program (ATP) |
![]() |
Existing ConditionsJadwin Avenue is a collector street that accesses Lewis and Clark Elementary School. It is the primary walk route for students accessing the school within the adjacent neighborhood. Jadwin Avenue currently does not have sidewalks on the east side and little to no accessible curb ramps connecting to adjacent streets. This project is needed to provide a safe, comfortable and accessible walk route for school children and the neighboring community at-large. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 17,333 | 6,090 | 23,423 |
Right of Way | 0 | 0 | 0 |
Construction | 207,991 | 73,079 | 281,070 |
Project Totals | $225,324 | $79,169 | $304,493 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
74.0% | 26.0% | 20% |
Summary of Improvements
- Improves pedestrian safety;
- Extends improvements;
- Creates direct access to school complex/business district/etc.;
- Removes ADA barriers
Description of Improvements
Construct sidewalk, ADA-accessible curb ramps, crosswalks, RRFBs and signage on the east side of Jadwin Avenue from Davenport Street to Gillespie St.