Projects — TIB Funding Cycles
FY 2024 APP Selections
|
|
||||
Region: Southeast | Legislative District: 15 | Length: 0.00 mi. | FY 2024 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 53,631 | 5,959 | 59,590 |
Right of Way | 0 | 0 | 0 |
Construction | 470,291 | 52,254 | 522,545 |
Project Totals | $523,922 | $58,213 | $582,135 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
Summary of Improvements
Description of Improvements
0.17 depth full width (32) grind and overlay for 1,650 linear feet. Includes the replacement of non compliant curb ramps, utility adjustments, crack sealing, pavement repair, and prelevel. W Fifth Street - Euclid Ed to Ave E Elm Street - Bonnieview Rd to Wine Country Rd