Projects — TIB Funding Cycles
FY 2024 APP Selections
|
|
||||
Region: Northeast | Legislative District: 13 | Length: 0.00 mi. | FY 2024 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 86,580 | 9,620 | 96,200 |
Right of Way | 0 | 0 | 0 |
Construction | 476,554 | 52,951 | 529,505 |
Project Totals | $563,134 | $62,571 | $625,705 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
Summary of Improvements
Description of Improvements
Digouts, crack sealing where needed. Grind and overlay. Replace noncompliant curb ramps and curbing. Nat Washington Way - A St SE to 2nd Ave SE