Projects — TIB Funding Cycles
FY 2024 APP Selections
|
|
||||
Region: Northeast | Legislative District: 9 | Length: 0.00 mi. | FY 2024 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 9,327 | 2,673 | 12,000 |
Right of Way | 0 | 0 | 0 |
Construction | 545,004 | 156,201 | 701,205 |
Project Totals | $554,331 | $158,874 | $713,205 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
77.7% | 22.3% | 15% |
Summary of Improvements
Description of Improvements
Grind/haul 2 in. HMA. Main travel lanes only, typ not TWLTL. 30 ft typ mill width, 45 ft wide at far north end. Skip two bridges and their approaches (done in 2018). Surface prep, spot repair, overlay w/2 in. HMA, restripe, and other incidental work for the following segment: Bishop Boulevard - Fairmount Dr to w/o SR 270