TIB Project Information

City of Kalama's Old Pacific Highway Sidewalk

P-W-953(P10)-1

P-W-953(P10)-1
Old Pacific Highway Sidewalk

450ft n/o Quartz Way to 750ft n/o Quartz Way

FY 2026 Active Transportation Program
Current Phase : Bid Authorization
Total TIB Funding : $315,030

County: Cowlitz   |   Legislative District: 20   |   Project Length: 500.00   |   TIB Engineer: Chris Langhoff   |   Last Payment Date:

Project Information

Lead Agency KALAMA
Funding Year 2026
Program ATP
Current Phase Bid Authorization
Legislative District 20
Congressional District 3
Federal Route Number A080
Project Length 500.00 mi.
ADT 0
Functional Class Collector
Type of Work Pedestrian
Project Contact Kelly Rasmusen
Contact Email krasmussen@cityofkalama.com
TIB Engineer Chris Langhoff
Last Payment Date
Cultural Resource Assessment CRA

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2024
Delayed Project Date 07/01/2027  
DAHP Assessment Date   03/20/2025
Predesign Approval
Design Approval 03/01/2025 03/05/2025
Bid Auth. Approval 04/01/2025 03/21/2025
Construction Approval 04/15/2025
Project Closeout 12/15/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 36,347 38,260
Right of Way 0 0
Total Design 36,347 38,260
     
Construction Engineering 36,347 38,260
Construction Contract 242,336 255,090
Other Construction 0 0
Total Construction 278,683 293,350
     
Total TIB Funding 315,030 331,610

Local Funding Partners

Funding Amount Percent
KALAMA 16,580 5.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 16,580 5.0%

Project Description

Adding new sidewalk and a crossing to fill the gap in active transportation facilities. The crossing will have ADA ramps to increase accessibility and RRFBs for increased pedestrian safety and visibility. The City will coordinate with the PUD to install new street lighting at the proposed crossing.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments