Providing a continuous pedestrian and bicycle facilities along SE May Creek Park Drive has been a priority for the City for years. The City has constructed multiple phases of pedestrian and bicycle facilities on almost 80 percent of the corridor. The final segment, between SE 84th Street and 129th Avenue SE, represents the final gap and completes a continuous loop around the City (116th Ave SE, Newcastle Way, Coal Creek Parkway SE, and finally SE May Creek Park Drive). SE May Creek Park Drive is a regional route for recreational bicycle users. It is common for over one hundred cyclists to travel along this route on a given weekend.
Projects — TIB Project Information
TIB Project Information
City of Newcastle's SE May Creek Park Drive NonMotorized Improvements Phase 2
P-P-200(P01)-1
P-P-200(P01)-1
SE May Creek Park Drive NonMotorized Improvements Phase 2
SE 84th Pl to 129th Ave SE
FY 2026 Active Transportation Program
Current Phase : Design
Total TIB Funding : $500,000
County: King | Legislative District: 41 | Project Length: 2,200.00 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
Lead Agency | NEWCASTLE |
Funding Year | 2026 |
Program | ATP |
Current Phase | Design |
Legislative District | 41 |
Congressional District | 9 |
Federal Route Number | 1338 |
Project Length | 2200.00 mi. |
ADT | 1,800 |
Functional Class | Collector |
Type of Work | Pedestrian |
Project Contact | Kerry Sullivan |
Contact Email | kerrys@newcastlewa.gov |
TIB Engineer | Greg Armstrong |
Last Payment Date | |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2024 | |
Delayed Project Date | 01/01/2026 | |
DAHP Assessment Date | 01/10/2025 | |
Predesign Approval | ||
Design Approval | 01/01/2025 | 12/20/2024 |
Bid Auth. Approval | 05/05/2025 | |
Construction Approval | 06/15/2025 | |
Project Closeout | 12/31/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 45,455 | 198,470 |
Construction Contract | 454,545 | 1,984,700 |
Other Construction | 0 | 0 |
Total Construction | 500,000 | 2,183,170 |
Total TIB Funding | 500,000 | 2,183,170 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
NEWCASTLE | 1,683,170 | 77.1% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 1,683,170 | 77.1% |
Project Description
Widens the road to provide two 10-foot wide travel lanes and two 6-foot bike lanes along with curb, gutter and sidewalks the northeast side of the road.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Completes gap;
- Removes ADA barriers
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |