City of Marysville's RRFB Pilot Project
P-P-143(P04)-1
P-P-143(P04)-1
RRFB Pilot Project
Various
FY 2024 Active Transportation Program
Current Phase : Audit
Total TIB Funding : $23,138
County: Snohomish | Legislative District: 38 | Project Length: 0.10 | TIB Engineer: Greg Armstrong | Last Payment Date: 11/30/2023
Project Information
Lead Agency | MARYSVILLE |
Funding Year | 2024 |
Program | ATP |
Current Phase | Audit |
Legislative District | 38 |
Congressional District | 2 |
Federal Route Number | 2685 |
Project Length | 0.10 mi. |
ADT | 0 |
Functional Class | Minor |
Type of Work | Pedestrian |
Project Contact | Max Phan |
Contact Email | mphan@marysvillewa.gov |
TIB Engineer | Greg Armstrong |
Last Payment Date | 11/30/2023 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 05/19/2023 | |
Delayed Project Date | 07/01/2025 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 06/21/2023 | 07/03/2023 |
Bid Auth. Approval | 07/07/2023 | 07/05/2023 |
Construction Approval | 07/07/2023 | 07/05/2023 |
Project Closeout | 11/30/2023 | 11/30/2023 |
Audit Date | 11/30/2023 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 32,000 | 27,512 |
Other Construction | 0 | 1,411 |
Total Construction | 32,000 | 28,923 |
Funding Surplus | - 8,862 | |
Total TIB Funding | 23,138 | 28,923 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
MARYSVILLE | 5,785 | 20.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 5,785 | 20.0% |
Project Description
City will install two RRFB's using local forces 1.25th Ave NE 200' south of 176th ST NE The RRFB crossing on 25th Ave NE approximately 200 feet south of 176th St NE serves as a crossing between multi-family housing and commercial amenities, and is approximately 1,000 feet from the next nearest pedestrian crossing facility that would result in significant out direction pedestrian travel. 2.27th Ave NE 166th PL NE (north leg) The installation of a RRFB crossing at 27th Ave NE and 166th Pl NE would improve the safety at this crossing due to the moderate traffic volumes on this minor arterial with a 25 MPH speed limit, and adjacent senior housing residents crossing 27th Ave NE to commercial amenities including Costco and Target.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |