TIB Project Information

City of Milton's Porter Way Sidewalk Improvements

P-P-132(P03)-1

P-P-132(P03)-1
Porter Way Sidewalk Improvements

7th Ave to Juniper St

FY 2026 Active Transportation Program
Current Phase : Design
Total TIB Funding : $360,866

County: Pierce/King   |   Legislative District: 31   |   Project Length: 300.00   |   TIB Engineer: Greg Armstrong   |   Last Payment Date:

Project Information

Lead Agency MILTON
Funding Year 2026
Program ATP
Current Phase Design
Legislative District 31
Congressional District 6
Federal Route Number 3286
Project Length 300.00 mi.
ADT 0
Functional Class Minor
Type of Work
Project Contact Dustin Madden
Contact Email dmadden@cityofmilton.net
TIB Engineer Greg Armstrong
Last Payment Date
Cultural Resource Assessment CRA

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2024
Delayed Project Date 07/01/2027  
DAHP Assessment Date  
Predesign Approval
Design Approval 01/15/2025 01/08/2025
Bid Auth. Approval 11/15/2025
Construction Approval 12/15/2025
Project Closeout 09/30/2026
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 41,633 48,980
Right of Way 0 0
Total Design 41,633 48,980
     
Construction Engineering 41,633 48,980
Construction Contract 277,600 326,590
Other Construction 0 0
Total Construction 319,233 375,570
     
Total TIB Funding 360,866 424,550

Local Funding Partners

Funding Amount Percent
MILTON 63,684 15.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 63,684 15.0%

Project Description

Construct a new 5 foot wide concrete sidewalk that is separated from traffic by curb and gutter. This project fill a 300 foot gaps along Porter Way between 7th Ave and Junpier St.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.