There is currently an approximate 300 foot gap in the sidewalk network on the East side of Porter Way from Juniper Street to 7th Avenue. This gap causes pedestrian to have to walk on a narrow shoulder (approximately 2 feet) that places them between northbound traffic and the existing guardrail.
Projects — TIB Project Information
TIB Project Information
City of Milton's Porter Way Sidewalk Improvements
P-P-132(P03)-1
P-P-132(P03)-1
Porter Way Sidewalk Improvements
7th Ave to Juniper St
FY 2026 Active Transportation Program
Current Phase : Design
Total TIB Funding : $360,866
County: Pierce/King | Legislative District: 31 | Project Length: 300.00 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
Lead Agency | MILTON |
Funding Year | 2026 |
Program | ATP |
Current Phase | Design |
Legislative District | 31 |
Congressional District | 6 |
Federal Route Number | 3286 |
Project Length | 300.00 mi. |
ADT | 0 |
Functional Class | Minor |
Type of Work | |
Project Contact | Dustin Madden |
Contact Email | dmadden@cityofmilton.net |
TIB Engineer | Greg Armstrong |
Last Payment Date | |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2024 | |
Delayed Project Date | 07/01/2027 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 01/15/2025 | 01/08/2025 |
Bid Auth. Approval | 11/15/2025 | |
Construction Approval | 12/15/2025 | |
Project Closeout | 09/30/2026 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 41,633 | 48,980 |
Right of Way | 0 | 0 |
Total Design | 41,633 | 48,980 |
Construction Engineering | 41,633 | 48,980 |
Construction Contract | 277,600 | 326,590 |
Other Construction | 0 | 0 |
Total Construction | 319,233 | 375,570 |
Total TIB Funding | 360,866 | 424,550 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
MILTON | 63,684 | 15.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 63,684 | 15.0% |
Project Description
Construct a new 5 foot wide concrete sidewalk that is separated from traffic by curb and gutter. This project fill a 300 foot gaps along Porter Way between 7th Ave and Junpier St.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Completes gap;
- Removes ADA barriers
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |