Broadway St. (US-195) is the main thoroughfare through town and is highly traveled. There are no stop lights accompanying two designated crosswalks.
Projects — TIB Project Information
TIB Project Information
Town of Colton's 2025 RRFB
P-E-908(P06)-1
P-E-908(P06)-1
2025 RRFB
Steptoe St to Gregor Str
FY 2026 Active Transportation Program
Current Phase : Design
Total TIB Funding : $46,200
County: Whitman | Legislative District: 9 | Project Length: 335.00 | TIB Engineer: Jonathan Heusman | Last Payment Date:
Project Information
Lead Agency | COLTON |
Funding Year | 2026 |
Program | ATP |
Current Phase | Design |
Legislative District | 9 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 335.00 mi. |
ADT | 4,900 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Jenni Straughan |
Contact Email | coltontownhall@hotmail.com |
TIB Engineer | Jonathan Heusman |
Last Payment Date | |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2024 | |
Delayed Project Date | 01/01/2026 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 01/01/2025 | 12/09/2024 |
Bid Auth. Approval | 05/01/2025 | |
Construction Approval | 06/01/2025 | |
Project Closeout | 08/01/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 4,200 | 4,200 |
Construction Contract | 42,000 | 42,000 |
Other Construction | 0 | 0 |
Total Construction | 46,200 | 46,200 |
Total TIB Funding | 46,200 | 46,200 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
COLTON | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The proposed solution is to add a trio of Rectangular Rapid Flashing Beacons (RRFBs) to two of the towns established crossings of US 195. This would include an RRFB facing each direction at each crosswalk as well as an additional linked RRFB positioned a block in front of the crossing upstream of the crosswalk.
Existing Condition
Project Benefits
- Improves safety;
- Improves pedestrian safety
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |