Multiple Locations

FY 2025 Active Transportation Program
Current Phase : Design
Total TIB Funding : $108,985

County: Okanogan/Douglas/Grant   |   Legislative District: 7   |   Project Length: 1.00   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 04/08/2025

Project Information

Lead Agency COULEE DAM
Funding Year 2025
Program ATP
Current Phase Design
Legislative District 7
Congressional District 4
Federal Route Number 9999
Project Length 1.00 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Pedestrian
Project Contact Stefani Bowden
Contact Email cdclerk@couleedam.org
TIB Engineer Andrew Beagle
Last Payment Date 04/08/2025
Cultural Resource Assessment BER

Project Schedule

  Target Date Actual Date
Project Selection Date   12/01/2023
Delayed Project Date 07/01/2026  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/01/2024 02/02/2024
Bid Auth. Approval 05/31/2025
Construction Approval 06/30/2025
Project Closeout 10/01/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 14,671 14,671
Right of Way 0 0
Total Design 14,671 14,671
     
Construction Engineering 10,479 10,479
Construction Contract 83,835 83,835
Other Construction 0 0
Total Construction 94,314 94,314
     
Total TIB Funding 108,985 108,985

Local Funding Partners

Funding Amount Percent
COULEE DAM 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

The solution is to install or upgrade existing ramps to comply with the ADA standards.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments