Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

City of Harrington's ADA Ramp Replacement

P-E-871(P01)-1

P-E-871(P01)-1
ADA Ramp Replacement

East Side of City

FY 2026 Active Transportation Program
Current Phase : Design
Total TIB Funding : $394,800

County: Lincoln   |   Legislative District: 9   |   Project Length: 1.00   |   TIB Engineer: Andrew Beagle   |   Last Payment Date:

Project Information

Lead Agency HARRINGTON
Funding Year 2026
Program ATP
Current Phase Design
Legislative District 9
Congressional District 5
Federal Route Number 9999
Project Length 1.00 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Pedestrian
Project Contact Joe Armand
Contact Email steven.marsh@tdhengineering.com
TIB Engineer Andrew Beagle
Last Payment Date
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2024
Delayed Project Date 07/01/2027  
DAHP Assessment Date  
Predesign Approval
Design Approval 12/01/2024 01/23/2025
Bid Auth. Approval 05/01/2025
Construction Approval 06/01/2025
Project Closeout 08/31/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 45,100 45,100
Right of Way 0 0
Total Design 45,100 45,100
     
Construction Engineering 38,900 38,900
Construction Contract 310,800 310,800
Other Construction 0 0
Total Construction 349,700 349,700
     
Total TIB Funding 394,800 394,800

Local Funding Partners

Funding Amount Percent
HARRINGTON 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

Replace the ADA ramps as indicated on the vicinity map.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments