City of Richland's George Washington Way Sidewalk

P-E-171(P07)-1

P-E-171(P07)-1
George Washington Way Sidewalk

Comstock St to Bradley Blvd

FY 2026 Active Transportation Program
Current Phase : Design
Total TIB Funding : $850,000

County: Benton   |   Legislative District: 8   |   Project Length: 1,411.00   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date:

Project Information

Lead Agency RICHLAND
Funding Year 2026
Program ATP
Current Phase Design
Legislative District 8
Congressional District 4
Federal Route Number 3475
Project Length 1411.00 mi.
ADT 40,616
Functional Class Principal
Type of Work Pedestrian
Project Contact Carlo DAlessandro
Contact Email Cdalessandro@ci.richland.wa.us
TIB Engineer Jonathan Heusman
Last Payment Date
Cultural Resource Assessment CRA

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2024
Delayed Project Date 07/01/2027  
DAHP Assessment Date  
Predesign Approval
Design Approval 08/04/2025 03/28/2025
Bid Auth. Approval 03/02/2026
Construction Approval 04/21/2026
Project Closeout 10/31/2026
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 113,333 141,666
Right of Way 0 0
Total Design 113,333 141,666
     
Construction Engineering 28,334 35,418
Construction Contract 708,333 885,416
Other Construction 0 0
Total Construction 736,667 920,834
     
Total TIB Funding 850,000 1,062,500

Local Funding Partners

Funding Amount Percent
RICHLAND 212,500 100.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 212,500 0.0%

Project Description

The proposed project installs an 8-foot-wide sidewalk that will integrate with ADA facilities at Comstock Street and Bradley Boulevard.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments