McBryde Avenue is a primary pedestrian corridor for the north side of the City. This corridor has pedestrian facilities west of Church Street to link the northwest side of town to the high school but has no facilities or inadequate facilities to serve the northeast areas of the City. The existing McBryde Avenue corridor west of Church Street is very narrow with a 10 foot asphalt lanes and limited shoulder width in many locations.
Projects — TIB Project Information
TIB Project Information
City of Montesano's McBryde Sidewalk CSP
C-W-957(001)-1
C-W-957(001)-1
McBryde Sidewalk CSP
Satsop St to Adams St
FY 2026 Complete Streets Program
Current Phase : Construction
Total TIB Funding : $217,761
County: Grays Harbor | Legislative District: 24 | Project Length: 0.00 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
Lead Agency | MONTESANO |
Funding Year | 2026 |
Program | CSP |
Current Phase | Construction |
Legislative District | 24 |
Congressional District | 6 |
Federal Route Number | 9999 |
Project Length | 0.00 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Mike Olden |
Contact Email | molden@montesano.us |
TIB Engineer | Chris Langhoff |
Last Payment Date | |
Cultural Resource Assessment | IDP |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2024 | |
Delayed Project Date | 01/01/2026 | |
DAHP Assessment Date | 04/08/2025 | |
Predesign Approval | ||
Design Approval | 12/14/2024 | 12/18/2024 |
Bid Auth. Approval | 04/22/2025 | 04/18/2025 |
Construction Approval | 05/15/2025 | 04/23/2025 |
Project Closeout | 09/15/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 235,000 | 240,000 |
Other Construction | 0 | 0 |
Total Construction | 235,000 | 240,000 |
Funding Surplus | - 17,239 | |
Total TIB Funding | 217,761 | 240,000 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
MONTESANO | 22,239 | 9.3% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 22,239 | 9.3% |
Project Description
Continue the work that was completed with TIB funds on the west side of the corridor by installing another 830 feet of sidewalk from Satsop Street to Adams Street.
Existing Condition
Project Benefits
- The proposed sidewalk will fill the last gap in sidewalk corridor. The improvements will address the ADA, mobility and safety issues. The project will include placement of ADA compliant ramps, provide a delineated walking corridor and provide a curb and an additional 2 of buffer between traffic and pedestrians.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |