Projects — TIB Project Information
TIB Project Information
City of Arlington's Complete Streets Award
C-P-817(001)-1
C-P-817(001)-1
Complete Streets Award
March 2019 Selection
FY 2020 Complete Streets Program
Current Phase : Audit
Total TIB Funding : $605,000
County: Snohomish | Legislative District: 39 | Project Length: 0.10 | TIB Engineer: Greg Armstrong | Last Payment Date: 02/26/2020
Project Information
Lead Agency | ARLINGTON |
Funding Year | 2020 |
Program | CSP |
Current Phase | Audit |
Legislative District | 39 |
Congressional District | 2 |
Federal Route Number | 9999 |
Project Length | 0.10 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Nova Heaton |
Contact Email | nheaton@arlingtonwa.gov |
TIB Engineer | Greg Armstrong |
Last Payment Date | 02/26/2020 |
Cultural Resource Assessment |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 03/22/2019 | |
Delayed Project Date | 07/01/2021 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 05/01/2019 | |
Bid Auth. Approval | 05/01/2019 | |
Construction Approval | 05/01/2019 | 04/23/2019 |
Project Closeout | 03/15/2022 | 03/17/2022 |
Audit Date | 03/17/2022 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 605,000 | 605,000 |
Other Construction | 0 | 0 |
Total Construction | 605,000 | 605,000 |
Total TIB Funding | 605,000 | 605,000 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
ARLINGTON | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Complete Streets Workplan
Item | Type of Work | Date Added | Est. Cost | Actual Cost | Complete |
---|---|---|---|---|---|
188th Street Sidewalk | Pedestrian | Mar 2019 | $130,000 | $130,000 | |
Install 600 lf of curb,gutter and sidewalk along the south side of 188th Street NE adjacent to two city parks and sports fields. Including a planter strip, low impact drainage improvements and street trees | |||||
59th Ave NE Sidewalk | Pedestrian | Mar 2019 | $262,000 | $262,000 | |
Install 750 lf of curb, gutter and sidewalk along the east side of 59th Ave NE adjacent to Bill Quake Park and sports fields. Including a planer strip, low impact drainage improvements and street trees. | |||||
Public Art Installation and Decorative Bike Rack | Bicycle; Aesthetics | Mar 2019 | $12,000 | $12,000 | |
Commission and install public art at the corner of 59th Ave and 188th Street to celebrate the youth sports activity in the area. Install decorative bike racks at city parks. | |||||
Mid-Block Crossing on 188th St NE | Pedestrian | Mar 2019 | $18,000 | $18,000 | |
Install a Rectangular Rapid Flashing Beacon, crosswalk, and ADA ramps between parking areas for three adjacent parks and a proposed future transit stop. | |||||
Mid-Block Crossing on 59th Ave NE | Pedestrian | Mar 2019 | $18,000 | $18,000 | |
Install a Rectangular Rapid Flashing Beacon, crosswalk, and ADA ramps to connect existing Airport Trail to Boys and Girl Club, parks and sports fields. | |||||
Evans Park Sidewalk | Pedestrian | Mar 2019 | $160,000 | $160,000 | |
Install 450 lf of shoulder, curb, gutter and sidewalk along the east side of 59th Ave NE adjacent to Evans Park | |||||
Complete Streets Leadership Academy | Feb 2020 | $5,000 | $5,000 | ||
Training and demostration project |
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |