City of Pomeroy's Main Street Sidewalk

C-E-929(002)-1

C-E-929(002)-1
Main Street Sidewalk

S 17th St to 25th St

FY 2026 Complete Streets Program
Current Phase : Design
Total TIB Funding : $999,700

County: Garfield   |   Legislative District: 9   |   Project Length: 0.66   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date:

Project Information

Lead Agency POMEROY
Funding Year 2026
Program CSP
Current Phase Design
Legislative District 9
Congressional District 5
Federal Route Number 0012
Project Length 0.66 mi.
ADT 0
Functional Class Principal
Type of Work Pedestrian
Project Contact Mike Lockard
Contact Email clerk1@pomeroy-wa.com
TIB Engineer Jonathan Heusman
Last Payment Date
Cultural Resource Assessment CRA

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2024
Delayed Project Date 07/01/2027  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/01/2025 12/11/2024
Bid Auth. Approval 07/01/2025
Construction Approval 08/01/2025
Project Closeout 10/31/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 173,025 173,025
Right of Way 0 0
Total Design 173,025 173,025
     
Construction Engineering 57,675 57,675
Construction Contract 769,000 769,000
Other Construction 0 0
Total Construction 826,675 826,675
     
Total TIB Funding 999,700 999,700

Local Funding Partners

Funding Amount Percent
POMEROY 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

This project will effectively close a gap in the existing sidewalk infrastructure by constructing new sidewalk from 17th Street to 25th Street.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.