Many of the streets in Oakesdale either do not have ADA ramps or non-compliant ADA ramps.
Projects — TIB Project Information
TIB Project Information
Town of Oakesdale's ADA Ramp Replacement
C-E-915(001)-1
C-E-915(001)-1
ADA Ramp Replacement
Entire Town
FY 2026 Complete Streets Program
Current Phase : Design
Total TIB Funding : $400,000
County: Whitman | Legislative District: 9 | Project Length: 0.00 | TIB Engineer: Jonathan Heusman | Last Payment Date:
Project Information
Lead Agency | OAKESDALE |
Funding Year | 2026 |
Program | CSP |
Current Phase | Design |
Legislative District | 9 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.00 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Mary DeGon |
Contact Email | townofoakesdale@msn.com |
TIB Engineer | Jonathan Heusman |
Last Payment Date | |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2024 | |
Delayed Project Date | 07/01/2027 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2025 | 12/10/2024 |
Bid Auth. Approval | 03/01/2026 | |
Construction Approval | 05/01/2026 | |
Project Closeout | 10/01/2026 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 53,846 | 53,846 |
Right of Way | 0 | 0 |
Total Design | 53,846 | 53,846 |
Construction Engineering | 38,462 | 38,462 |
Construction Contract | 307,692 | 307,692 |
Other Construction | 0 | 0 |
Total Construction | 346,154 | 346,154 |
Total TIB Funding | 400,000 | 400,000 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
OAKESDALE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
Construct/replace 30 ADA ramps to current standards.
Existing Condition
Project Benefits
- The project either adds or removes/replaces 30 ADA ramps that are currently barriers for ADA. Most ADA ramps occur on Steptoe and Bartlett.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |