This project is the second phase of a city-wide ADA ramp replacement project. The first phase was funded in 2024 under ATP and focused primarily on the east side of Town.
Projects — TIB Project Information
TIB Project Information
Town of Coulee Dam's Sidewalk and ADA Ramp Replacement
C-E-878(001)-1
C-E-878(001)-1
Sidewalk and ADA Ramp Replacement
Town Limits
FY 2026 Complete Streets Program
Current Phase : Application
Total TIB Funding : $970,730
County: Okanogan/Douglas/Grant | Legislative District: 7 | Project Length: 0.00 | TIB Engineer: Andrew Beagle | Last Payment Date:
Project Information
Lead Agency | COULEE DAM |
Funding Year | 2026 |
Program | CSP |
Current Phase | Application |
Legislative District | 7 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.00 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Stefani Bowden |
Contact Email | cdclerk@couleedam.org |
TIB Engineer | Andrew Beagle |
Last Payment Date | |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2024 | |
Delayed Project Date | 07/01/2027 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2025 | |
Bid Auth. Approval | 02/15/2026 | |
Construction Approval | 04/15/2026 | |
Project Closeout | 12/31/2026 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 121,840 | 121,840 |
Right of Way | 65,600 | 65,600 |
Total Design | 187,440 | 187,440 |
Construction Engineering | 87,030 | 87,030 |
Construction Contract | 696,260 | 696,260 |
Other Construction | 0 | 0 |
Total Construction | 783,290 | 783,290 |
Total TIB Funding | 970,730 | 970,730 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
COULEE DAM | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The project either adds or removes/replaces 53 ADA ramps on the west side of Town and removes/replaces approximately 140 upheaved sidewalk panels on River Dr, Central Dr, Camas St, and Tilmus St.
Existing Condition
Project Benefits
- The project either adds or removes/replaces 53 ADA ramps on the west side of Town (Engineers City) and removes/replaces approximately 140 upheaved sidewalk panels on streets located near the school (River Dr, Central Dr, Camas St, and Tilmus St).
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |