The intersection of S. Toppenish Avenue and W. 1st Avenue existing sidewalks, curb ramps, and crosswalks are non-ADA compliant and do not provide a safe route for pedestrian travel. The lane widths are over 16 feet wide and not ideal for safely crossing the street. The intersections roadway surface is deteriorating asphalt.
Projects — TIB Project Information
TIB Project Information
City of Toppenish's Downtown Intersection Improvements
C-E-178(004)-1
C-E-178(004)-1
Downtown Intersection Improvements
Intersection Improvements
FY 2026 Complete Streets Program
Current Phase : Design
Total TIB Funding : $1,529,554
County: Yakima | Legislative District: 14 | Project Length: 0.00 | TIB Engineer: Jonathan Heusman | Last Payment Date: 03/14/2025
Project Information
Lead Agency | TOPPENISH |
Funding Year | 2026 |
Program | CSP |
Current Phase | Design |
Legislative District | 14 |
Congressional District | 4 |
Federal Route Number | 6404 |
Project Length | 0.00 mi. |
ADT | 0 |
Functional Class | Minor |
Type of Work | Traffic Control |
Project Contact | Shaun Burgess |
Contact Email | Shaun.Burgess@CityofToppenish.us |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 03/14/2025 |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2024 | |
Delayed Project Date | 07/01/2027 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 01/06/2025 | 01/30/2025 |
Bid Auth. Approval | 05/21/2025 | |
Construction Approval | 06/23/2025 | |
Project Closeout | 10/24/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 175,968 | 195,520 |
Right of Way | 0 | 0 |
Total Design | 175,968 | 195,520 |
Construction Engineering | 175,968 | 195,520 |
Construction Contract | 1,177,618 | 1,308,465 |
Other Construction | 0 | 0 |
Total Construction | 1,353,586 | 1,503,985 |
Total TIB Funding | 1,529,554 | 1,699,505 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
TOPPENISH | 169,951 | 10.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 169,951 | 10.0% |
Project Description
The project includes roadway, sidewalks, bulb outs, curb ramps, crosswalks, signal with pedestrian push buttons, and landscaping improvements.
Existing Condition
Project Benefits
- All design elements for this project have the overarching goal of creating a more safe and appealing intersection in an integral part of the City. The new sidewalk and curb ramps will increase accessibility by being ADA-compliant. The bulb outs will reduce lane widths of the road, making it easier and safer to cross the road in combination with the new signal and pedestrian push buttons. The reduced lane width will also help control vehicular traffic, and the new signal will ease the entire intersection into functioning smoothly. Landscaping will be incorporated into the sidewalk and bulb out design to encourage greenspace in this downtown area. Overall, this project will increase safety and accessibility for both pedestrian and vehicular traffic. This project is intended to kick-off a downtown revitalization effort to create a better and safer community.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |