The current condition of Rose Street between Ash Ave. and Carey Ct. is dark, and the lighting will help increase visibility, safety and reduce petty crimes.
Projects — TIB Project Information
TIB Project Information
City of College Place's Rose Street Multiuse Path Illumination
C-E-177(003)-1
C-E-177(003)-1
Rose Street Multiuse Path Illumination
NE Ash Ave to NE Carey Ct
FY 2026 Complete Streets Program
Current Phase : Design
Total TIB Funding : $1,825,692
County: Walla Walla | Legislative District: 16 | Project Length: 0.00 | TIB Engineer: Jonathan Heusman | Last Payment Date:
Project Information
Lead Agency | COLLEGE PLACE |
Funding Year | 2026 |
Program | CSP |
Current Phase | Design |
Legislative District | 16 |
Congressional District | 5 |
Federal Route Number | 7190 |
Project Length | 0.00 mi. |
ADT | 0 |
Functional Class | Principal |
Type of Work | |
Project Contact | Mike Rizzitiello |
Contact Email | mrizzitiello@cpwa.us |
TIB Engineer | Jonathan Heusman |
Last Payment Date | |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2024 | |
Delayed Project Date | 07/01/2027 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 01/01/2025 | 12/30/2024 |
Bid Auth. Approval | 05/31/2025 | |
Construction Approval | 07/01/2025 | |
Project Closeout | 12/31/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 215,354 | 239,282 |
Right of Way | 67,389 | 74,877 |
Total Design | 282,743 | 314,159 |
Construction Engineering | 110,545 | 122,828 |
Construction Contract | 1,432,404 | 1,591,560 |
Other Construction | 0 | 0 |
Total Construction | 1,542,949 | 1,714,388 |
Total TIB Funding | 1,825,692 | 2,028,547 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
COLLEGE PLACE | 202,855 | 10.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 202,855 | 10.0% |
Project Description
The project will illuminate and improve the safety of the multiuse path and sidewalks along the NE Rose Street corridor from College Ave to Carey Court.
Existing Condition
Project Benefits
- The multiuse path is designed and purposed for bicycles and pedestrians and features ADA ramps at intersections. It also provides connectivity to the regions public transit system. The path lacks pedestrian lighting and pedestrian road crossing signaling. The existing lighting is at publicly owned intersections and does not provide lighting for the multiuse path;
- the intersection lighting needs to be increased to meet lighting standards. The project will illuminate the multiuse path on the south side of the Rose Street corridor and the sidewalk on the north side of Rose Street from Lambert Ave. to Carey Ct. This project has been in our Capital Facility Plan for the past six years. We have been seeking grant funding to complete the lighting and pedestrian signals along the Rose Street multiuse path so that it provides safe connections to the City of Walla Walla and public transportation. The general distance between the pedestrian lighting fixtures is eighty (80) feet. The project includes an RRFB crossing Rose Street at the intersection of Damson Ave.;
- the City of College Place is seeking grant funding through WSDOT to improve the railroad crossing at Damson Ave which includes a bus stop. The RRFB will provide improved safety for pedestrians using the multiuse path to access the bus stop. The RRFB will be constructed contingent upon receiving funds for the railroad improvements at Damson Ave. The luminaires will be similar to the existing poles and fixtures on College Ave.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |