City of East Wenatchee's 3rd Avenue Bike and Ped improvements
C-E-161(003)-1
C-E-161(003)-1
3rd Avenue Bike and Ped improvements
N Georgia Ave to N Hanford Ave
FY 2026 Complete Streets Program
Current Phase : Audit
Total TIB Funding : $403,403
County: Douglas | Legislative District: 12 | Project Length: 1,160.00 | TIB Engineer: Andrew Beagle | Last Payment Date: 01/29/2025
Project Information
Lead Agency | EAST WENATCHEE |
Funding Year | 2026 |
Program | CSP |
Current Phase | Audit |
Legislative District | 12 |
Congressional District | 4 |
Federal Route Number | 5912 |
Project Length | 1160.00 mi. |
ADT | 0 |
Functional Class | Collector |
Type of Work | Safety |
Project Contact | Garren Melton |
Contact Email | gmelton@eastwenatcheewa.gov |
TIB Engineer | Andrew Beagle |
Last Payment Date | 01/29/2025 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 05/17/2024 | |
Delayed Project Date | 05/17/2027 | |
DAHP Assessment Date | 06/27/2024 | |
Predesign Approval | ||
Design Approval | 05/31/2024 | 06/12/2024 |
Bid Auth. Approval | 07/30/2024 | 06/28/2024 |
Construction Approval | 08/05/2024 | 08/08/2024 |
Project Closeout | 12/31/2024 | 01/28/2025 |
Audit Date | 01/29/2025 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 51,510 | 38,196 |
Right of Way | 0 | 0 |
Total Design | 51,510 | 38,196 |
Construction Engineering | 34,340 | 15,338 |
Construction Contract | 343,400 | 440,767 |
Other Construction | 0 | 0 |
Total Construction | 377,740 | 456,105 |
Funding Surplus | - 25,847 | |
Total TIB Funding | 403,403 | 494,301 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
EAST WENATCHEE | 71,345 | 14.4% |
WSDOT Funding | 0 | 0.0% |
Eastmont Park District | 19,553 | 4.0% |
Total Local Funding | 90,898 | 17.7% |
Project Description
Restriping and resin bonded stone surfacing to reconfigure roadway with protected bike lanes. Paving needed for roadway reconfiguration and expense of striping. ADA ramps.
Existing Condition
Project Benefits
- Safety, speed management. Ped/bike mobility and safety.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |