Minimal pavement section with travelled way and on-street parking.
Projects — TIB Project Information
TIB Project Information
City of Wenatchee's Bridge Street Multimodal Corridor
C-E-160(005)-1
C-E-160(005)-1
Bridge Street Multimodal Corridor
S Wenatchee Ave to S Columbia S
FY 2026 Complete Streets Program
Current Phase : Design
Total TIB Funding : $1,263,360
County: Chelan | Legislative District: 12 | Project Length: 0.00 | TIB Engineer: Andrew Beagle | Last Payment Date:
Project Information
Lead Agency | WENATCHEE |
Funding Year | 2026 |
Program | CSP |
Current Phase | Design |
Legislative District | 12 |
Congressional District | 8 |
Federal Route Number | 9999 |
Project Length | 0.00 mi. |
ADT | 0 |
Functional Class | Local Access |
Type of Work | Pedestrian |
Project Contact | Jake Lewing |
Contact Email | jlewing@wenatcheewa.gov |
TIB Engineer | Andrew Beagle |
Last Payment Date | |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2024 | |
Delayed Project Date | 07/01/2027 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2024 | 12/23/2024 |
Bid Auth. Approval | 12/31/2026 | |
Construction Approval | 02/28/2027 | |
Project Closeout | 10/31/2027 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 152,160 | 190,200 |
Right of Way | 0 | 0 |
Total Design | 152,160 | 190,200 |
Construction Engineering | 122,160 | 152,700 |
Construction Contract | 989,040 | 1,236,300 |
Other Construction | 0 | 0 |
Total Construction | 1,111,200 | 1,389,000 |
Total TIB Funding | 1,263,360 | 1,579,200 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
WENATCHEE | 315,840 | 20.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 315,840 | 20.0% |
Project Description
The project consists of reconfigured roadway with one-way lane and two-way bicycle track, sidewalks, pedestrian lighting, designated parking, and safety features like RRFBs and ADA-compliant ramps.
Existing Condition
Project Benefits
- This will tie into future proposed improvements on S. Wenatchee Ave. that will also include buffered bike lanes, landscaping and wide sidewalks. This project provides access to the Apple Capital loop Trail for South Wenatchee residents, a historically underserved population. Overall, the project seeks to connect vulnerable populations to non-motorized trails, commercial areas, waterfront parks and other recreational areas.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |