City of Wenatchee's Complete Streets Award
C-E-160(003)-1
C-E-160(003)-1
Complete Streets Award
March 2022 Selection
FY 2023 Complete Streets Program
Current Phase : Construction
Total TIB Funding : $600,000
County: Chelan | Legislative District: 12 | Project Length: 0.50 | TIB Engineer: Andrew Beagle | Last Payment Date: 07/15/2022
Project Information
Lead Agency | WENATCHEE |
Funding Year | 2023 |
Program | CSP |
Current Phase | Construction |
Legislative District | 12 |
Congressional District | 8 |
Federal Route Number | 9999 |
Project Length | 0.50 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Ryan Harmon |
Contact Email | rharmon@wenatcheewa.gov |
TIB Engineer | Andrew Beagle |
Last Payment Date | 07/15/2022 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 03/30/2022 | |
Delayed Project Date | 03/30/2025 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 04/01/2023 | 04/15/2022 |
Bid Auth. Approval | 04/01/2023 | 04/15/2022 |
Construction Approval | 11/01/2023 | 04/15/2022 |
Project Closeout | 03/01/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 600,000 | 600,000 |
Other Construction | 0 | 0 |
Total Construction | 600,000 | 600,000 |
Total TIB Funding | 600,000 | 600,000 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
WENATCHEE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Complete Streets Workplan
Item | Type of Work | Date Added | Est. Cost | Actual Cost | Complete |
---|---|---|---|---|---|
High Pedestrian Use Areas - Construct Sidewalks | Pedestrian | Mar 2022 | $185,000 | $165,549 | |
Construct sidewalk on streets where no sidewalk currently exists, prioritize locations based on Link Transit rider data and proximity to schools, parks, grocery stores, etc. | |||||
Pedestrian Master Plan | Pedestrian | Mar 2022 | $50,000 | $43,374 | |
Utilize data athered from public outreach efforts performed in 2018 to finalize development of Pedestrian Master Plan. | |||||
Bicycle Infrastructure, Delineation, and Channelization Improvements |
Bicycle | Mar 2022 | $90,000 | $100,462 | |
Re-channelize Cherry Street to add bike lanes in conjunction with 2022 Paving Project. Fill in existing bike-lane gap on Maple Street from Gabriella to Western Ave. Purchase/install new bike racks. Identify locations for bicycle detection marking at existing signals. Install bicycle way finding signs throughout the City. Install bicycle video detection at signal on First and Miller. | |||||
Worthen Street Pedestrian and Bicycle Improvements | Pedestrian; Bicycle | Mar 2022 | $215,000 | $362,218 | |
Enhance channelization, ped/bike delineation, and add illumination to a 2,500-ft length of Worthen Street from Thurston St to Hale Skate Park parking lot, where the Apple Capital Recreational Loop Trail runs along the shoulder of the existing vehicle traveled way. | |||||
Okanogan/Orondo Bulb Out and Rechannelization | Pedestrian; Bicycle | Mar 2022 | $60,000 | $60,000 | |
Implement recommendations from the Complete Streets Leadership Academy Demonstration Project Pop-up event at intersection of Okanogan, Methow, and Orondo Avenue to address pedestrian and bicycle connectivity, in conjunction with 2022 Paving Project. |
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |