Shepherd Road is a two-lane collector between Washougal River Road and NE 3rd Avenue. Mid way along this stretch between N 12th St and N 4th Ct is a waterfront park called Sandy Swimming Hole. Access to the park can only be attained off Shepherd Road and the existing park has only a few spaces to accommodate residents. There are no existing sidewalk or bike connections to the park and visitors often illegally park off within the roadway and the surrounding neighborhoods.
Projects — TIB Project Information
TIB Project Information
City of Washougal's Shepherd Road Pedestrian Connection
8-5-186(009)-1
8-5-186(009)-1
Shepherd Road Pedestrian Connection
Washougal River Rd to Lebrun Blvd
FY 2026 Urban Arterial Program
Current Phase : Design
Total TIB Funding : $3,473,835
County: Clark | Legislative District: 17 | Project Length: 1.00 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
Lead Agency | WASHOUGAL |
Funding Year | 2026 |
Program | UAP |
Current Phase | Design |
Legislative District | 17 |
Congressional District | 3 |
Federal Route Number | 7056 |
Project Length | 1.00 mi. |
ADT | 2,027 |
Functional Class | Collector |
Type of Work | Pedestrian |
Project Contact | Scott Collins |
Contact Email | Scott.Collins@cityofwashougal.us |
TIB Engineer | Chris Langhoff |
Last Payment Date | |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2024 | |
Delayed Project Date | 07/01/2029 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 01/01/2025 | 01/07/2025 |
Bid Auth. Approval | 03/27/2026 | |
Construction Approval | 05/01/2026 | |
Project Closeout | 10/17/2026 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 353,271 | 441,589 |
Right of Way | 0 | 0 |
Total Design | 353,271 | 441,589 |
Construction Engineering | 176,636 | 220,795 |
Construction Contract | 2,943,928 | 3,679,910 |
Other Construction | 0 | 0 |
Total Construction | 3,120,564 | 3,900,705 |
Total TIB Funding | 3,473,835 | 4,342,294 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
WASHOUGAL | 868,459 | 20.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 868,459 | 20.0% |
Project Description
The City plans to widen Shepherd Road to the north allowing for on-street parking, new bicycle lanes, and new sidewalk connections. The City also plans to incorporate traffic calming due to the speeds and install a raised crosswalk so pedestrians can access the park while reducing vehicle speed along the corridor.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Restores structural condition;
- Removes ADA barriers
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |