Lawrence Street is a major route for walking, biking, rolling, and transit in the Uptown Business District, which includes many commercial destinations for residents and visitors alike. The corridor is primary access to SR20 and the entire Uptown neighborhood and historic district. On-street parking serves both sides but is poorly organized. Existing sidewalk and pavement are in poor condition and sidewalk is missing on the south side for 3 blocks creating a barrier to all users.
Projects — TIB Project Information
TIB Project Information
City of Port Townsend's Lawrence Street Multimodal Improvements
8-2-151(007)-1
8-2-151(007)-1
Lawrence Street Multimodal Improvements
Harrison St to Walker St
FY 2026 Urban Arterial Program
Current Phase : Design
Total TIB Funding : $2,992,000
County: Jefferson | Legislative District: 24 | Project Length: 0.33 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
Lead Agency | PORT TOWNSEND |
Funding Year | 2026 |
Program | UAP |
Current Phase | Design |
Legislative District | 24 |
Congressional District | 6 |
Federal Route Number | 7612 |
Project Length | 0.33 mi. |
ADT | 3,645 |
Functional Class | Collector |
Type of Work | Resurfacing |
Project Contact | Steve King |
Contact Email | sking@cityofpt.us |
TIB Engineer | Chris Langhoff |
Last Payment Date | |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2024 | |
Delayed Project Date | 07/01/2029 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 03/01/2025 | 02/03/2025 |
Bid Auth. Approval | 01/01/2026 | |
Construction Approval | 02/01/2026 | |
Project Closeout | 12/31/2026 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 421,531 | 582,000 |
Right of Way | 0 | 0 |
Total Design | 421,531 | 582,000 |
Construction Engineering | 255,671 | 353,000 |
Construction Contract | 2,203,259 | 3,042,000 |
Other Construction | 111,539 | 154,000 |
Total Construction | 2,570,469 | 3,549,000 |
Total TIB Funding | 2,992,000 | 4,131,000 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
PORT TOWNSEND | 1,139,000 | 27.6% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 1,139,000 | 27.6% |
Project Description
Port Townsend has successfully changed Water Street and Tyler Street with 9.5 foot vehicle lanes and 7 foot parking lanes to allow installation of 6-foot marked bicycle lanes with a 2-foot horizontal door zone against on-street parking on each side of the street. Finallly, pavement rehabilitation will address a huge liability for the new TBD which voters passes a 0.3% sales tax with 80% approval.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Restores structural condition;
- Removes ADA barriers
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |