TIB Project Information

City of Kenmore's 61st Avenue NE Pedestrian and Bicycle Improvements

8-1-206(003)-1

8-1-206(003)-1
61st Avenue NE Pedestrian and Bicycle Improvements

NE 190th St to 62nd Ave NE

FY 2026 Urban Arterial Program
Current Phase : Construction
Total TIB Funding : $2,213,330

County: King   |   Legislative District: 1   |   Project Length: 0.80   |   TIB Engineer: Greg Armstrong   |   Last Payment Date:

Project Information

Lead Agency KENMORE
Funding Year 2026
Program UAP
Current Phase Construction
Legislative District 1
Congressional District 1
Federal Route Number 2407
Project Length 0.80 mi.
ADT 6,800
Functional Class Minor
Type of Work Resurfacing
Project Contact John Vicente
Contact Email jvicente@kenmorewa.gov
TIB Engineer Greg Armstrong
Last Payment Date
Cultural Resource Assessment CRA

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2024
Delayed Project Date 01/01/2026  
DAHP Assessment Date   07/18/2024
Predesign Approval
Design Approval 12/01/2024 12/11/2024
Bid Auth. Approval 04/15/2025 03/17/2025
Construction Approval 04/15/2025 04/17/2025
Project Closeout 07/01/2026
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 606,061 739,349
Construction Contract 1,893,939 3,028,954
Other Construction 0 0
Total Construction 2,500,000 3,768,303
     
Funding Surplus - 286,670  
Total TIB Funding 2,213,330 3,768,303

Local Funding Partners

Funding Amount Percent
KENMORE 380,708 10.1%
WSDOT Funding 0 0.0%
WSDOT Ped/Bike  1,174,265 26.9%
 
 
 
 
 
 
 
Total Local Funding 1,554,973 37.0%

Project Description

The project will re-establish continuous sidewalk on the east and west sides of the street from NE 190th St to the north city limits and include narrowed 10 traveled lanes and designated 5 bike lanes with buffers (where possible) by repurposing existing pavement width currently used for on-street parking and auxiliary right turn lanes. Curb extensions at the intersections of 193rd St, 60th Ave and 197th St are included in the project to reduce pedestrian crossing distance and pedestrian crossing time in conflict with vehicles. Additionally, the existing eastbound to southbound 193rd St right turn slip lane onto 61st Ave has a high crash rate and will be permanently closed with the project the intersection approach will be constructed as a minor stop controlled t-intersection. RRFB crosswalks across 61st Ave at 193rd St, 60th Ave and 200th StStreet will be installed to provide safe pedestrian passage connecting residential areas at these busy intersections. Speed feedback signs approaching 193rd St and 60th Ave will be strategically placed to help slow traffic where pedestrians enter 61st Avenue NE at busy intersections of 193rd St and 60th Ave. The existing pavement, deteriorated with alligator cracking and trench patches will be rehabilitated with a 2 grind and overlay and underlying pavement repair.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments