TIB Project Information

City of Shoreline's 145th Street Corridor Phases 2 and 3

8-1-202(010)-1

8-1-202(010)-1
145th Street Corridor Phases 2 and 3

Corliss Ave N to Interurban Trail

FY 2026 Urban Arterial Program
Current Phase : Design
Total TIB Funding : $6,500,000

County: King   |   Legislative District: 32   |   Project Length: 0.70   |   TIB Engineer: Greg Armstrong   |   Last Payment Date:

Project Information

Lead Agency SHORELINE
Funding Year 2026
Program UAP
Current Phase Design
Legislative District 32, 46
Congressional District 7
Federal Route Number 0523
Project Length 0.70 mi.
ADT 22,000
Functional Class Principal
Type of Work Major Widening
Project Contact Cory Nau
Contact Email cnau@shorelinewa.gov
TIB Engineer Greg Armstrong
Last Payment Date
Cultural Resource Assessment Section 106

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2024
Delayed Project Date 07/01/2029  
DAHP Assessment Date   02/25/2020
Predesign Approval
Design Approval 03/13/2025 03/12/2025
Bid Auth. Approval 08/01/2026
Construction Approval 12/04/2026
Project Closeout 12/31/2028
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 2,120,000 10,113,500
Total Design 2,120,000 10,113,500
     
Construction Engineering 630,000 2,552,400
Construction Contract 3,750,000 15,014,140
Other Construction 0 0
Total Construction 4,380,000 17,566,540
     
Total TIB Funding 6,500,000 27,680,040

Local Funding Partners

Funding Amount Percent
SHORELINE 2,429,919 8.8%
WSDOT Funding 0 0.0%
FHWA STP  5,480,000 19.8%
RAISE  13,270,121 47.9%
 
 
 
 
 
 
Total Local Funding 21,180,040 76.5%

Project Description

This project will improve safety and operations to reduce traffic delay increasing transit speed/reliability creating better access for people moving along the corridor and accessing new light rail. Design includes signalized intersection improvements and signal timing adjustments. Included will be new dedicated left turn lanes with phasing at Meridian Ave longer left turn queue EB approaching Aurora Ave and curbing to prevent left turns from NB Midvale and Lenora Ave which currently turn into the Aurora WB turn queue (accident reduction measures). Project removes obstacles to pedestrians on both sides of street and includes improved sidewalks and crosswalks, pedestrian countdown signals, and ADA accessible curb ramps. North side improvements will provide a higher comfort/safety level with wider sidewalk and amenity zone. Project improves pedestrian lighting advances bus stop access/user experience and re-directs bicyclists to off-corridor facilities. Conflict points will be reduced to help reduce accidents. Improvements will help reduce congestion and benefit access, mobility, and safety for all modes of transportation. Project supports two growing candidate Countywide Centers (Shoreline has rezoned up to MUR-70) helping provide access to the many employment, educational, commercial, and recreational opportunities that connecting with a regional transit system provides and helping to maximize the return on the Sound Transit multi-billion dollar investment.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.