City of Lakewood's Nyanza Road SW

8-1-199(019)-1

8-1-199(019)-1
Nyanza Road SW

Gravelly Lake Dr S to Gravelly Lake Dr N

FY 2026 Urban Arterial Program
Current Phase : Design
Total TIB Funding : $1,250,001

County: Pierce   |   Legislative District: 28   |   Project Length: 1.17   |   TIB Engineer: Greg Armstrong   |   Last Payment Date:

Project Information

Lead Agency LAKEWOOD
Funding Year 2026
Program UAP
Current Phase Design
Legislative District 28
Congressional District 10
Federal Route Number 2881
Project Length 1.17 mi.
ADT 9,187
Functional Class Minor
Type of Work Resurfacing
Project Contact Troy Pokswinski
Contact Email tpokswinski@cityoflakewood.us
TIB Engineer Greg Armstrong
Last Payment Date
Cultural Resource Assessment CRA

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2024
Delayed Project Date 01/01/2026  
DAHP Assessment Date   04/15/2025
Predesign Approval
Design Approval 12/01/2024 12/03/2024
Bid Auth. Approval 04/17/2025
Construction Approval 05/10/2025
Project Closeout 10/31/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 48,438 155,000
Construction Contract 1,201,563 3,845,000
Other Construction 0 0
Total Construction 1,250,001 4,000,000
     
Total TIB Funding 1,250,001 4,000,000

Local Funding Partners

Funding Amount Percent
LAKEWOOD 2,749,999 68.7%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 2,749,999 68.7%

Project Description

Sidewalks along both sides of Nyanza Road between the south and north ends of Gravelly Lake Drive will be installed. This includes a widened sidewalk along the west side of Nyanza for bikes and pedestrians. This will match improvements along the other portions of Gravelly Lake. The roadway will be resurfaced with a three-inch depth hot mix asphalt overlay following significant pavement repair. This will be an economic benefit to the project in lieu of pulverizing and reconstructing. The three-inch section will work well into the future with the base lift and pavement repair at the current stage.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.