Harbour Pointe Boulevard is a four-lane arterial with no sidewalk along the south side.
Projects — TIB Project Information
TIB Project Information
City of Mukilteo's Harbour Point Boulevard
8-1-145(004)-1
8-1-145(004)-1
Harbour Point Boulevard
SR 525 to Cyrus Way
FY 2016 Urban Arterial Program
Current Phase : Audit
Total TIB Funding : $1,039,790
County: Snohomish | Legislative District: 21 | Project Length: 0.30 | TIB Engineer: Greg Armstrong | Last Payment Date: 12/31/2020
Project Information
| Lead Agency | MUKILTEO |
| Funding Year | 2016 |
| Program | UAP |
| Current Phase | Audit |
| Legislative District | 21 |
| Congressional District | 2 |
| Federal Route Number | 2722 |
| Project Length | 0.30 mi. |
| ADT | 17,892 |
| Functional Class | Collector |
| Type of Work | Major Widening |
| Project Contact | Andrea Swisstack |
| Contact Email | aswisstack@mukilteowa.gov |
| TIB Engineer | Greg Armstrong |
| Last Payment Date | 12/31/2020 |
| Cultural Resource Assessment | CRA |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2014 | |
| Delayed Project Date | 07/01/2019 | |
| DAHP Assessment Date | 09/21/2016 | |
| Predesign Approval | ||
| Design Approval | 05/26/2015 | 05/21/2015 |
| Bid Auth. Approval | 11/01/2018 | 08/16/2018 |
| Construction Approval | 03/18/2019 | 03/21/2019 |
| Project Closeout | 12/15/2020 | 12/16/2020 |
| Audit Date | 12/31/2020 | |
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 146,178 | 331,153 |
| Right of Way | 39,000 | 66,054 |
| Total Design | 185,178 | 397,208 |
| Construction Engineering | 73,146 | 391,211 |
| Construction Contract | 731,466 | 1,580,841 |
| Other Construction | 0 | 10,662 |
| Total Construction | 804,612 | 1,982,713 |
| Funding Increase | 50,000 | |
| Total TIB Funding | 1,039,790 | 2,379,921 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| MUKILTEO | 1,266,448 | 53.2% |
| WSDOT Funding | 0 | 0.0% |
| PSE | 38,454 | 1.6% |
| ICM | 35,229 | 1.5% |
| Total Local Funding | 1,340,131 | 56.3% |
Project Description
This project widens Harbour Pointe Boulevard to include four travel lanes, a two-way left turn lane, curb, gutter and sidewalk. In addition, the project replaces existing high-pressure sodium luminaire fixtures with LED streetlights and stormwater will be treated using rain gardens.
Existing Condition
Project Benefits
- Improves safety;
- Relieves congestion;
- Utilizes low-energy lighting
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||