Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

City of Fife's 20th Street E Multimodal Improvements

8-1-134(017)-1

8-1-134(017)-1
20th Street E Multimodal Improvements

5410 20th St E to 6400 block

FY 2025 Urban Arterial Program
Current Phase : Design
Total TIB Funding : $8,683,852

County: Pierce   |   Legislative District: 27   |   Project Length: 0.42   |   TIB Engineer: Greg Armstrong   |   Last Payment Date: 03/31/2025

Project Information

Lead Agency FIFE
Funding Year 2025
Program UAP
Current Phase Design
Legislative District 27
Congressional District 6
Federal Route Number 3260
Project Length 0.42 mi.
ADT 13,000
Functional Class Minor
Type of Work Reconstruction
Project Contact Greg Vigoren
Contact Email gvigoren@cityoffife.org
TIB Engineer Greg Armstrong
Last Payment Date 03/31/2025
Cultural Resource Assessment CRA

Project Schedule

  Target Date Actual Date
Project Selection Date   12/01/2023
Delayed Project Date 07/01/2028  
DAHP Assessment Date  
Predesign Approval
Design Approval 01/10/2024 01/10/2024
Bid Auth. Approval 05/01/2026
Construction Approval 06/01/2026
Project Closeout 10/31/2027
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 1,103,360 1,403,072
Right of Way 482,187 609,625
Total Design 1,585,547 2,012,697
     
Construction Engineering 711,623 907,395
Construction Contract 6,386,682 8,107,991
Other Construction 0 0
Total Construction 7,098,305 9,015,386
     
Total TIB Funding 8,683,852 11,028,083

Local Funding Partners

Funding Amount Percent
FIFE 2,344,231 21.3%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 2,344,231 21.3%

Project Description

This project will improve 20th Street between 5410 20th St E and 62nd Ave E. The project will improve mobility, safety, access, road capacity and structural condtion. The project will construct a 10 to 12 shared use path along the south side of the street in front of Fife High School and the Aquatic Center, providing a user-friendly facility for pedestrians and cyclists. The shared use path will have curb and planter strip separating users from traffic. The shared use path will connect to a shared use path in front of Fife Elementary. On the north side, the project will construct a sidewalk separated with a curb and planter strip. This will complete a 390-foot sidewalk gap at the Fife High western entrance, and two additional sidewalk gaps totaling 790 feet across 20th St from Fife Elementary. At driveways and intersections, the project will improve safety and mobility by shortening pedestrian crossing distances, tightening curb radii, and upgrading ADA facilities. The project will complete a missing segment of center turn lane between 58th Ave and 62nd Ave. The project will address physical deficiencies by resurfacing the roadway, stabilizing subgrade, upgrading storm water systems, replacing the water main, and adding lighting. Speed reduction to 30 MPH.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments