City of Tacoma's E Roosevelt Avenue Improvements

8-1-128(098)-1

8-1-128(098)-1
E Roosevelt Avenue Improvements

E 38th St to E Sherman St

FY 2026 Urban Arterial Program
Current Phase : Bid Authorization
Total TIB Funding : $2,213,118

County: Pierce   |   Legislative District: 29   |   Project Length: 0.40   |   TIB Engineer: Greg Armstrong   |   Last Payment Date:

Project Information

Lead Agency TACOMA
Funding Year 2026
Program UAP
Current Phase Bid Authorization
Legislative District 29
Congressional District 10
Federal Route Number 3137
Project Length 0.40 mi.
ADT 833
Functional Class Collector
Type of Work Reconstruction
Project Contact Charla Kinlow
Contact Email ckinlow@cityoftacoma.org
TIB Engineer Greg Armstrong
Last Payment Date
Cultural Resource Assessment CRA

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2024
Delayed Project Date 01/01/2026  
DAHP Assessment Date   02/20/2025
Predesign Approval
Design Approval 02/01/2025 01/28/2025
Bid Auth. Approval 04/08/2025 03/28/2025
Construction Approval 04/29/2025
Project Closeout 06/30/2026
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 340,480 425,600
Construction Contract 1,872,638 2,340,798
Other Construction 0 0
Total Construction 2,213,118 2,766,398
     
Total TIB Funding 2,213,118 2,766,398

Local Funding Partners

Funding Amount Percent
TACOMA 453,280 16.4%
WSDOT Funding 0 0.0%
Metro Parks Tacoma  100,000 18.1%
 
 
 
 
 
 
 
Total Local Funding 553,280 0.0%

Project Description

This project will include road reconstruction from East 38th Street to East Gregory Street, where the subgrade has failed. The pavement from East Gregory to East Sherman, on the north side of the project, is proposed to be addressed with a grind and overlay. This project will close sidewalk gaps and construct 7-foot-wide sidewalks, curb, and gutter along both sides of the corridor. The project includes pedestrian bulbouts and accessible ramps at 6 intersections (38th, George, 37th, 36th, Gregory, and Division). Existing signal at the Division Ave intersection school crossing will be upgraded to enhance pedestrian safety with a raised pedestrian crossing and APS pushbuttons. Planting areas and street trees, along with narrower driving lanes will help enforce speed limit restrictions and create an environment that encourages active transportation options accessibly to all users.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.