City of Tukwila's S 124th St and 50th Pl S

8-1-116(015)-1

8-1-116(015)-1
S 124th St and 50th Pl S

Vicinity of S 124th St and 50th Pl S intersection

FY 2026 Urban Arterial Program
Current Phase : Design
Total TIB Funding : $900,404

County: King   |   Legislative District: 11   |   Project Length: 0.14   |   TIB Engineer: Greg Armstrong   |   Last Payment Date:

Project Information

Lead Agency TUKWILA
Funding Year 2026
Program UAP
Current Phase Design
Legislative District 11
Congressional District 9
Federal Route Number 1362
Project Length 0.14 mi.
ADT 8,000
Functional Class Collector
Type of Work Safety
Project Contact Catrien de Boer
Contact Email Catrien.deBoer@TukwilaWA.gov
TIB Engineer Greg Armstrong
Last Payment Date
Cultural Resource Assessment CRA

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2024
Delayed Project Date 07/01/2029  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/07/2025 02/06/2025
Bid Auth. Approval 04/01/2026
Construction Approval 06/01/2026
Project Closeout 12/31/2027
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 101,552 129,870
Right of Way 0 0
Total Design 101,552 129,870
     
Construction Engineering 121,859 155,840
Construction Contract 676,993 865,777
Other Construction 0 0
Total Construction 798,852 1,021,617
     
Total TIB Funding 900,404 1,151,487

Local Funding Partners

Funding Amount Percent
TUKWILA 251,083 21.8%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 251,083 21.8%

Project Description

1. Remove the EB right turn slip lane and reconfiguring the intersection with single-lane approaches, requiring all vehicles to come to a complete stop. Requiring all vehicles to come to a stop will significantly reduce the speed at which cars are turning onto 50th Pl. 2. Add a highly-visible marked pedestrian crossing at the intersection to allow pedestrians to cross the street safely. The proposed improvements seek to shorten the crossing length (currently 65) while maintaining enough space for trucks to make the southbound left-turn movement onto 50th Pl S out of the BNSF yard. 3. Construct a continuous pedestrian walkway on the north side of 124th St between 49th Ave S and 51st Pl. This dedicated path will provide a safe route from the neighborhood to the Tukwila Community Center and Codiga Park. 4. Construct a protected pedestrian path where the slip lane currently exists and improve crossing at the S 125th St and 50th Pl intersection. This will tie into the newly constructed protected pedestrian path on 50th Pl S, spanning from S 125th St southbound to Codiga Park.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.