The existing concrete roadway has been cut and is broken in many places, resulting in an uneven driving surface. The existing walkway on the westerly side of the road is uneven and only 4 feet wide in some places.
Projects — TIB Project Information
TIB Project Information
Town of Cathlamet's Butler Street Reconstruction
6-W-979(007)-1
6-W-979(007)-1
Butler Street Reconstruction
Main St(SR 409) to Una Ave
FY 2026 Small City Arterial Program
Current Phase : Design
Total TIB Funding : $341,387
County: Wahkiakum | Legislative District: 19 | Project Length: 0.05 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
Lead Agency | CATHLAMET |
Funding Year | 2026 |
Program | SCAP |
Current Phase | Design |
Legislative District | 19 |
Congressional District | 3 |
Federal Route Number | 9999 |
Project Length | 0.05 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Reconstruction |
Project Contact | Jacquelyn Gribble |
Contact Email | projectmanager@townofcathlamet.com |
TIB Engineer | Chris Langhoff |
Last Payment Date | |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2024 | |
Delayed Project Date | 07/01/2027 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 01/01/2025 | 12/17/2024 |
Bid Auth. Approval | 01/01/2026 | |
Construction Approval | 02/01/2026 | |
Project Closeout | 12/01/2026 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 36,506 | 36,506 |
Right of Way | 25,000 | 25,000 |
Total Design | 61,506 | 61,506 |
Construction Engineering | 36,506 | 36,506 |
Construction Contract | 243,375 | 243,375 |
Other Construction | 0 | 0 |
Total Construction | 279,881 | 279,881 |
Total TIB Funding | 341,387 | 341,387 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
CATHLAMET | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The roadway will be rebuilt in its current location. The existing extruded curb on the easterly side of the road will be replaced with curb and gutter. The existing curb and walkway on the westerly side of the road will be replaced with curb and gutter and accessible sidewalks and driveway entrances. Minor storm drainage improvements will be added to direct runoff to the existing system.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Restores structural condition;
- Removes ADA barriers
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |