City of Montesano's W. Pioneer Avenue

6-W-957(I13)-1

6-W-957(I13)-1
W. Pioneer Avenue

Main to 4th

FY 2024 Small City Arterial Program
Current Phase : Audit
Total TIB Funding : $151,327

County: Grays Harbor   |   Legislative District: 19   |   Project Length: 0.19   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 12/30/2024

Project Information

Lead Agency MONTESANO
Funding Year 2024
Program SCAP
Current Phase Audit
Legislative District 19
Congressional District 6
Federal Route Number 5189
Project Length 0.19 mi.
ADT 2,000
Functional Class Collector
Type of Work Reconstruction
Project Contact Mike Olden
Contact Email molden@montesano.us
TIB Engineer Chris Langhoff
Last Payment Date 12/30/2024
Cultural Resource Assessment Section 106

Project Schedule

  Target Date Actual Date
Project Selection Date   12/02/2022
Delayed Project Date 07/01/2025  
DAHP Assessment Date   12/19/2023
Predesign Approval
Design Approval 02/01/2023 01/09/2023
Bid Auth. Approval 12/15/2023 12/19/2023
Construction Approval 02/29/2024 03/29/2024
Project Closeout 12/30/2024 12/13/2024
Audit Date   12/30/2024
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 146,633
Right of Way 13,500 10,728
Total Design 13,500 157,361
     
Construction Engineering 0 188,230
Construction Contract 175,500 1,173,371
Other Construction 0 0
Total Construction 175,500 1,361,601
     
Funding Surplus - 37,673  
Total TIB Funding 151,327 1,518,962

Local Funding Partners

Funding Amount Percent
MONTESANO 0 0.0%
WSDOT Funding 0 0.0%
FHWA  1,367,635 90.0%
 
 
 
 
 
 
 
Total Local Funding 1,367,635 90.0%

Project Description

The solution is to replace the sidewalks and approaches and replace pavement at intersections with full depth reconstruction. Pavement outside of the intersections will be ground to 1 inch depth with an HMA overlay with of 2 inches. Catch basins wil be upgraded at intersections.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.