City of Elma's F Street Improvements

6-W-955(013)-1

6-W-955(013)-1
F Street Improvements

Young St to Oakhurst St

FY 2026 Small City Arterial Program
Current Phase : Design
Total TIB Funding : $787,074

County: Grays Harbor   |   Legislative District: 24   |   Project Length: 0.14   |   TIB Engineer: Chris Langhoff   |   Last Payment Date:

Project Information

Lead Agency ELMA
Funding Year 2026
Program SCAP
Current Phase Design
Legislative District 24
Congressional District 6
Federal Route Number 9999
Project Length 0.14 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Reconstruction
Project Contact Rick Eaton
Contact Email pwdirector@cityofelma.com
TIB Engineer Chris Langhoff
Last Payment Date
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2024
Delayed Project Date 07/01/2027  
DAHP Assessment Date  
Predesign Approval
Design Approval 01/08/2025 01/07/2025
Bid Auth. Approval 02/05/2026
Construction Approval 03/11/2026
Project Closeout 07/31/2026
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 76,000 80,000
Right of Way 0 0
Total Design 76,000 80,000
     
Construction Engineering 76,000 80,000
Construction Contract 635,074 668,500
Other Construction 0 0
Total Construction 711,074 748,500
     
Total TIB Funding 787,074 828,500

Local Funding Partners

Funding Amount Percent
ELMA 41,426 5.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 41,426 5.0%

Project Description

The project would construct a 30 foot wide road (face of curb to face of curb) with two 11 travel lanes, one 8 parking lane, curb, gutter and sidewalk (one side) to provide a safer roadway and pedestrian access route for the residents of the multifamily housing to reach the hospital, church, and shopping facilities to the south.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments