The pavement was last assessed in 2022 and was rated 36-40. The pavement shows major signs of subrade failure such as alligator cracking and potholing. There is currently no pedestrian access route or curb ramp accessibility.
Projects — TIB Project Information
TIB Project Information
City of Wapato's S Naches Avenue FDR
6-E-946(008)-1
6-E-946(008)-1
S Naches Avenue FDR
4th St to 6th St
FY 2026 Small City Arterial Program
Current Phase : Application
Total TIB Funding : $535,990
County: Yakima | Legislative District: 14 | Project Length: 0.12 | TIB Engineer: Jonathan Heusman | Last Payment Date:
Project Information
Lead Agency | WAPATO |
Funding Year | 2026 |
Program | SCAP |
Current Phase | Application |
Legislative District | 14 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.12 mi. |
ADT | 500 |
Functional Class | TIB Arterial |
Type of Work | Reconstruction |
Project Contact | Jeff Schumacker |
Contact Email | jschumacker@wapato-city.org |
TIB Engineer | Jonathan Heusman |
Last Payment Date | |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2024 | |
Delayed Project Date | 07/01/2027 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2025 | |
Bid Auth. Approval | 12/15/2026 | |
Construction Approval | 03/01/2027 | |
Project Closeout | 10/01/2027 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 61,845 | 65,100 |
Right of Way | 0 | 0 |
Total Design | 61,845 | 65,100 |
Construction Engineering | 61,845 | 65,100 |
Construction Contract | 412,300 | 434,000 |
Other Construction | 0 | 0 |
Total Construction | 474,145 | 499,100 |
Total TIB Funding | 535,990 | 564,200 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
WAPATO | 28,210 | 5.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 28,210 | 5.0% |
Project Description
This project will restore the condition of the roadway through full-depth reclamation, install pedestrian facilities, and provide ADA-compliant curb ramps.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |