City of Lynden's 1st and Main St Overlay

3-W-839(008)-1

3-W-839(008)-1
1st and Main St Overlay

Main St. approx. 2nd St. to 1st St. and 1st St. approx. Grover St. to RR tracks

FY 2026 Arterial Preservation Program
Current Phase : Design
Total TIB Funding : $374,239

County: Whatcom   |   Legislative District: 42   |   Project Length: 0.32   |   TIB Engineer: Chris Langhoff   |   Last Payment Date:

Project Information

Lead Agency LYNDEN
Funding Year 2026
Program APP
Current Phase Design
Legislative District 42
Congressional District 2
Federal Route Number 8160
Project Length 0.32 mi.
ADT 0
Functional Class Collector
Type of Work Resurfacing
Project Contact Mark Sandal
Contact Email sandalm@lyndenwa.org
TIB Engineer Chris Langhoff
Last Payment Date
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2024
Delayed Project Date 07/01/2027  
DAHP Assessment Date  
Predesign Approval
Design Approval 01/01/2025 01/28/2025
Bid Auth. Approval 05/01/2025
Construction Approval 06/01/2025
Project Closeout 10/31/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 29,940 41,895
Right of Way 0 0
Total Design 29,940 41,895
     
Construction Engineering 44,908 62,840
Construction Contract 299,391 418,939
Other Construction 0 0
Total Construction 344,299 481,779
     
Total TIB Funding 374,239 523,674

Local Funding Partners

Funding Amount Percent
LYNDEN 149,435 28.5%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 149,435 28.5%

Project Description

2 inch grind and overlay

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments