City of Port Angeles's Marine Drive Overlay

3-W-150(004)-1

3-W-150(004)-1
Marine Drive Overlay

Hill Street to Mill Bridge

FY 2026 Arterial Preservation Program
Current Phase : Design
Total TIB Funding : $531,248

County: Clallam   |   Legislative District: 24   |   Project Length: 0.41   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 03/25/2025

Project Information

Lead Agency PORT ANGELES
Funding Year 2026
Program APP
Current Phase Design
Legislative District 24
Congressional District 6
Federal Route Number 7574
Project Length 0.41 mi.
ADT 0
Functional Class Collector
Type of Work Resurfacing
Project Contact Jonathan Boehme
Contact Email jboehme@cityofpa.us
TIB Engineer Chris Langhoff
Last Payment Date 03/25/2025
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2024
Delayed Project Date 07/01/2027  
DAHP Assessment Date  
Predesign Approval
Design Approval 12/30/2024 01/07/2025
Bid Auth. Approval 05/01/2025
Construction Approval 06/01/2025
Project Closeout 10/30/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 48,296 64,394
Right of Way 0 0
Total Design 48,296 64,394
     
Construction Engineering 53,661 71,548
Construction Contract 429,291 572,388
Other Construction 0 0
Total Construction 482,952 643,936
     
Total TIB Funding 531,248 708,330

Local Funding Partners

Funding Amount Percent
PORT ANGELES 177,082 25.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 177,082 25.0%

Project Description

2 inch grind and overlay

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.