Projects — TIB Project Information
TIB Project Information
City of Moses Lake's 2025 Chip Seal
3-E-162(001)-1
3-E-162(001)-1
2025 Chip Seal
Multiple Locations
FY 2026 Arterial Preservation Program
Current Phase : Design
Total TIB Funding : $1,045,618
County: Grant | Legislative District: 13 | Project Length: 6.43 | TIB Engineer: Andrew Beagle | Last Payment Date:
Project Information
Lead Agency | MOSES LAKE |
Funding Year | 2026 |
Program | APP |
Current Phase | Design |
Legislative District | 13 |
Congressional District | 4 |
Federal Route Number | |
Project Length | 6.43 mi. |
ADT | 0 |
Functional Class | Collector |
Type of Work | Resurfacing |
Project Contact | Levi Bisnett |
Contact Email | lbisnett@cityofml.com |
TIB Engineer | Andrew Beagle |
Last Payment Date | |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2024 | |
Delayed Project Date | 07/01/2027 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 01/01/2025 | 02/11/2025 |
Bid Auth. Approval | 05/27/2025 | |
Construction Approval | 06/15/2025 | |
Project Closeout | 12/25/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 60,000 | 75,000 |
Right of Way | 0 | 0 |
Total Design | 60,000 | 75,000 |
Construction Engineering | 60,000 | 75,000 |
Construction Contract | 925,618 | 1,157,023 |
Other Construction | 0 | 0 |
Total Construction | 985,618 | 1,232,023 |
Total TIB Funding | 1,045,618 | 1,307,023 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
MOSES LAKE | 261,405 | 20.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 261,405 | 20.0% |
Project Description
Seal Coat and Striping Reconfiguration with 4 lanes to 3 Lanes, Intersection Optimization, Increased Parking, Bike Lanes and Sharrows, Reduced Crosswalk Lengths and future maintenance cost reductions.
Existing Condition
Project Benefits
- Asset Management
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |