Valley Mall Parkway Avg PCR 50
Projects — TIB Project Information
TIB Project Information
City of East Wenatchee's Valley Mall Parkway Overlay
3-E-161(005)-1
3-E-161(005)-1
Valley Mall Parkway Overlay
Multiple Locations
FY 2026 Arterial Preservation Program
Current Phase : Design
Total TIB Funding : $665,767
County: Douglas | Legislative District: 12 | Project Length: 0.36 | TIB Engineer: Andrew Beagle | Last Payment Date:
Project Information
Lead Agency | EAST WENATCHEE |
Funding Year | 2026 |
Program | APP |
Current Phase | Design |
Legislative District | 12 |
Congressional District | 4 |
Federal Route Number | 5901 |
Project Length | 0.36 mi. |
ADT | 0 |
Functional Class | Minor |
Type of Work | Resurfacing |
Project Contact | Garren Melton |
Contact Email | gmelton@eastwenatcheewa.gov |
TIB Engineer | Andrew Beagle |
Last Payment Date | |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2024 | |
Delayed Project Date | 07/01/2027 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 01/01/2025 | 01/08/2025 |
Bid Auth. Approval | 04/25/2025 | |
Construction Approval | 06/03/2025 | |
Project Closeout | 10/01/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 56,421 | 66,378 |
Right of Way | 0 | 0 |
Total Design | 56,421 | 66,378 |
Construction Engineering | 45,137 | 53,102 |
Construction Contract | 564,209 | 663,775 |
Other Construction | 0 | 0 |
Total Construction | 609,346 | 716,877 |
Total TIB Funding | 665,767 | 783,255 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
EAST WENATCHEE | 117,488 | 15.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 117,488 | 15.0% |
Project Description
Grind and overlay full width of roadway, perform pavement repair as needed.
Existing Condition
Project Benefits
- Asset preservation.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |