City of Castle Rock's 2025 Chip Seal

2-W-952(009)-1

2-W-952(009)-1
2025 Chip Seal

Multiple Locations

FY 2026 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $133,459

County: Cowlitz   |   Legislative District: 19   |   Project Length: 2.24   |   TIB Engineer: Chris Langhoff   |   Last Payment Date:

Project Information

Lead Agency CASTLE ROCK
Funding Year 2026
Program SCPP
Current Phase Design
Legislative District 19
Congressional District 3
Federal Route Number 9999
Project Length 2.24 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact David Vorse
Contact Email crpwd@ci.castle-rock.wa.us
TIB Engineer Chris Langhoff
Last Payment Date
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2024
Delayed Project Date 07/01/2027  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/01/2025 12/03/2024
Bid Auth. Approval 04/15/2025
Construction Approval 06/01/2025
Project Closeout 10/30/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 133,459 142,984
Other Construction 0 0
Total Construction 133,459 142,984
     
Total TIB Funding 133,459 142,984

Local Funding Partners

Funding Amount Percent
CASTLE ROCK 9,525 6.7%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 9,525 6.7%

Project Description

Chip seal

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.